Completed Projects

SJK(T) Ladang Kulai Besar

With TCC’s funding assistance, the school obtained 6 new sets of multimedia education system which were installed in classrooms 4A/3K, 4M, 4T/3S, 5K, 5S and 5T. Continue reading

SJK(T) Ladang Lanadron

With TCC’s funding assistance, 3 sets of multimedia education system were installed in Standard 3, 4 and 6 classrooms in HQ and 2 sets were installed in Standard 5 classroom and ICT room at the branch (Palaniappa). Continue reading

SJK(T) Pulau Sebang

With TCC’s funding assistance, the school installed 5 sets of Multimedia Education system in Standard 1, 2, 3, 4 and 5 classrooms. Continue reading

SJK(T) Ladang Kemuning KRU

With TCC’s contribution, 4 sets of Multimedia Education system were installed in Standard 1, 4, 5 and 6 classrooms and this interactive learning system will definitely enhance the teaching and delivery methods for both teachers and students. Continue reading

SJK(T) Ladang Seremban

TCC’s contribution of 6 sets of Eco Net Multimedia Education system further enhances students’ fun and effective learning in school. Teachers will now have multitude ways to deliver learning activities and content. Continue reading

SJK(C) Jeransong

TCC contributed RM134,800 towards the successful completion of the new 2-storey extension block, that has improved the school facilities and able to cater for more students. Continue reading

SJK(C) Jeram

TCC contributed RM180,000 to upgrade another block of single-storey building comprising of 4 classrooms. The refurbishment works include re-roofing, reinforced existing structure (strengthening structure), painting works, supply and install plaster ceiling, window frames and metal doors. Continue reading

SJK(C) Man Ming

TCC fully sponsored the construction of a new block of 2-storey building comprising of 6 rooms to cater to the school’s requirement. The construction works commenced in April 2017 and the new building obtained its Certificate of Practical Completion (“CPC”) on 27 September 2017. Continue reading

SJK(C) Desa Jaya 2

TCC therefore provided funding to extend the canteen seating capacity allowing more canteen tables and benches as well as provided covered concrete walkway connecting students’ waiting area to the main classroom building. Continue reading

SJK(C) Kah Wah

The school wrote to TCC requesting funding for upgrade surrounding the school which covered the construction of fencing, mix of concrete and chain link, for the entire perimeter of the school together with metal gates, refurbished compound drainage, school field turfing and premix road within school compound. In addition, school requested to utilise funding for the supply of stainless steel canteen table and benches. Continue reading

SJK(C) Khai Chee

TCC contributed toward the construction of one block of 4 storey building, comprising 24 classrooms, teachers’ room, meeting room, computer room, badminton court, multi-purpose hall with tiered seating upper level, canteen and basement car park facilities. Continue reading

SJK(C) Rasa

This school is a partially aided school located within Chinese new village. The school was re-located to residential area in February 2017 as the school’s old premise could not expand any further due to limited space. The school wrote to TCC requesting for replacement of their wooden canteen tables and chairs which is not in good condition. TCC provided funding for a total of 31 new sets of stainless steel canteen tables and benches. Continue reading

SJK(C) Paya Mengkuang

The school launched the new building known as “The Community Chest Building” on 21 September 2017. The new building has a total of nine classrooms with six classrooms used for Standard 1 to 6 and the remaining for teachers’ room and administration office. Continue reading

SJK(C) Wu Teck

This school has a total of 15 classrooms. With TCC’s funding assistance, 3 sets of multimedia education systems were installed consisting of 63” HD LED TV with built in PC, 15ft aluminium sliding green board, digital visualizer, workstation, stylus pen and remote control in Classrooms 310, 311 and 312. Continue reading

SJK(C) Pay Fong 1

TCC provided funding towards the construction of SJK(C) Pay Fong 1’s three new buildings and the one block of 3-storey Academic building was named “The Community Chest Building”. Continue reading

SK St. Francis

This missionary school was established in 1872. The school was facing shortage of floor spaces for administration office, teachers’ room, library and computer room as well as lacking of a Multi-Purpose hall. In view of this, the school decided to demolish an existing single-storey school building and construct a new block of 3- storey building to accommodate these facilities. Continue reading